Solar Energy Systems

Engineered Rooftop Solar Sized Precisely to Your Load.

Maximize Government Subsidies with Verified Calculations.

Experienced Team, Topcon Hardware, and 25-Year Warranties.

Reliable After-Sales Support with Prompt Local Response.

From residential rooftop plants under PM Surya Ghar to commercial setups, our certified technical crew designs every array for maximum long-term efficiency.

Contact Us

Experienced Technicians

Certified electricians ensuring secure roof anchoring, earthing, and safety protocols.

Full After-Sales Care

Local support in Andhra Pradesh for inverter maintenance and generation checks.

Subsidy Assistance

End-to-end paperwork handled directly on the PM Surya Ghar national portal.

Tier-1 Hardware

Precision System Architecture

High-Efficiency PV Modules

Mono-PERC and TopCon cells engineered for high heat tolerance with 25+ year performance warranties.

Smart MPPT Inverters

Advanced tracking inverters that synchronize clean power with your connected appliances and grid.

Net Metering & Storage

Export surplus power for bill credits or route energy into storage banks for power outages.

System Models

Choose the System for Your Energy Profile

On-Grid Solar

Connected directly to your local DISCOM network. Export surplus power for credits. Fastest ROI.

Off-Grid Solar

Independent battery-backed systems for farms, poultry sheds, or remote sites with no grid connection.

Hybrid Solar + Battery

Exports surplus while maintaining instant battery backup during load shedding for critical loads.

PM Surya Ghar Yojana

Direct Government Subsidy Structure

System CapacitySubsidy CalculationMaximum Central Subsidy
Up to 1 kW₹30,000 per kW₹30,000
1 kW to 2 kW₹30,000 per kWUp to ₹60,000
2 kW to 3 kW₹60,000 + ₹18,000 for 3rd kWUp to ₹78,000
Above 3 kWSubsidy Capped₹78,000 (Maximum Central Cap)

Subsidies are credited directly to your bank account via the National Portal following DISCOM inspection. Arka handles all portal documentation.

Frequently Asked Questions

Solar Installation FAQs

How do I receive the central government subsidy?

The subsidy is released directly to your bank account via the National Portal following DISCOM net-meter commissioning. Arka prepares and tracks the full submission.

How long does complete commissioning take?

Physical mounting takes 2 to 3 days. Net meter installation and DISCOM paperwork typically take 2 to 3 weeks based on local circle approvals.

Can I upgrade to a battery system later?

Yes, by choosing a hybrid-ready inverter from day one. You can integrate battery banks later without rewiring your solar array.

What maintenance does solar require?

Cleaning panel surfaces with soft water every 10–15 days prevents dust accumulation and protects maximum conversion efficiency.

Get a precise solar engineering audit for your property.